The site where we built our Entertainment Stage is pictured below

January 17, 2004 Click here or on the above left picture to see twenty stage assembly pictures.
Click here or above right picture to see twenty-two February 07, 2004 stage raising pictures.
May 08, 2004. Above and below Patrick Myers, currently serving on our Board of Trustees as Construction Superintendant, and Museum Volunteer Richard Green, fasten rough sawn plywood on the
inside between the two bottom stringers. Below left you can see the stack of flooring material alongside the road next to Richards pick-up truck.
May 14, 2004. Above and below Patrick Myers and Museum Trustee / Secretary Jack Lester sheath the roof with plywood.
May 18, 2004. Above the roof sheathing and floor are complete. June 4, 2005 applying a clear protective coating. Below left: Myrna Bagge sits down
on the job while Sharon Martin works on the deck. Below right: Sharon sits down while Myrna stands.

August 27, 2005 below four Summergrass San Diego Bluegrass Festival pictures.